Mid-May and work focuses on north side

Posted on in Construction Alerts
  • Font size: Larger Smaller
  • Subscribe to this entry
  • Print

 

 

In the last week or so there have been a lot of changes along the two-block corridor on Jefferson which means progress.

 

The contractor poured concrete pavement between Leavenworth and Hyde. It should be opened up to traffic on Monday. That means traffic will flow in one continuous lane westbound from Jones to Hyde (on the new roadway).

 

The pre-cast concrete walls were delivered to the jobsite and you may see them lined up between Leavenworth and Jones.

 

The north road way Jones to Leavenworth has been demo'd and work has begun to all of the underground work: sewer work, street light foundation work, water service connections, and water meter installations.

 

Also, work continues at the intersections.

 

 

Next week

 

 

Between Jones and Leavenworth: work continues on the north side with sewer, electrical, and water work.

 

SATURDAY WORK SCHEDULED: The contractor plans to work this coming Saturday (tomorrow). They will be digging for the pre-cast wall foundations and possibly pouring concrete in the afternoon on the Jones to Leavenworth side.

 

Between Hyde and Leavenworth: traffic will begin using the new roadway, one direction westbound. The old roadway on the north side will be demo'd and hauled away. Work is set to begin at Hyde moving toward Leavenworth.